Water Main Replacement 2026 Phase 2 PRV
BID DATE
04/9/26 - 3:00
AGENCY
Bellevue
ESTIMATE
$7,500,000
SCOPE
Constructing approximately 10,100 LF of ductile iron water mains, • Installing new fire hydrant assemblies, • Installing replacement water services, • Constructing a replacement Pressure Reducing Valve in a concrete vault, • Abandoning existing Pressure Reducing Valve station, • Construction dewatering, • Relocating existing utilities (as required), • Abandoning asbestos cement pipe, • Restoring surface conditions, including asphalt trench patching and concrete curbs, gutters and sidewalks, • Performing traffic control, • Other work as required to complete the project. http://bxwa.com/bxwa_toc/pub/255/blv75_water_main_replacement_2_68970/info.php Asabeeh@bellevuewa.gov