Access the Full Project by Clicking here!
Bidjugde
JOB
2024 Sewer Repair Replacement
BID DATE
04/14/26 - 4:00
AGENCY
Auburn
ESTIMATE
$1,450,000
SCOPE
Install a new section of 8” PVC sewer main to connect two sewer manholes on Terrace Drive and ‘V’ Street NW, and abandon an existing sewer line in the easement between ‘W’ Street NW and ‘V’ Street NW. Replace the existing PVC sewer main with an 8-inch ductile iron pipe (DIP) sewer main between existing manholes on F Street SW, including replacement of side sewers within the City right-of-way. Work at this site also includes full roadway reconstruction of F Street SW between Station 10+35.95 and Station 14+37.53. Replace a section of 10” concrete pipe with 10 PVC near Auburn Way South, connecting a manhole to an existing PVC line to eliminate a gap. Install a new extra shallow manhole in the alley west of A St NW. Replace 210 feet of 8” sewer pipe with 8” PVC, including side sewer reconnections and cleanouts at property lines. http://bxwa.com/bxwa_toc/pub/2038/aub83_2024_sewer_repair_and_re_42299/info.php nkahsay@auburnwa.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT