Access the Full Project by Clicking here!
Bidjugde
JOB
26 06 Cambridge Pump Station Upgrades
BID DATE
05/1/26 - 7:30
AGENCY
Port Orange
ESTIMATE
n/a
SCOPE
This project consists of the installation of approximately 250 feet of 54-inch DIP storm main and 250 feet of 72-inch steel casing by jack and bore under the FEC Railway running North to South. Additionally, 445 feet of 72-inch PCCP storm main will be installed by open cut connecting the proposed pump station to the outfall location east of the FEC railway. Sod replacement, driveway, roadway and right-of-way repair, including concrete, asphalt, dirt, and gravel replacement in kind will be required at all disturbed areas. https://www.port-orange.org/bids.aspx?bidID=236 cityclerk@port-orange.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT