Access the Full Project by Clicking here!
Bidjugde
JOB
Taxiway A West Extension
BID DATE
04/23/26 - 7:00
AGENCY
Orlando Sanford Intl Airport
ESTIMATE
n/a
SCOPE
The Sanford Airport Authority (SAA) is soliciting competitive, sealed proposals from interested and qualified firms to provide construction services for the Taxiway A West Extension project, which includes the following items: Extend Taxiway A to the west approximately 3,950 feet. Construct new Taxiway A1, connector between Taxiway A and the runway end. Design taxiway edge lighting and signage to accommodate changes the proposed taxiway extension. Modifications to the existing airfield electrical vault equipment to support additional load. Design stormwater dry retention pond for treatment of proposed pavement. Design stormwater drainage infrastructure to accommodate proposed taxiway extension. Relocate existing wind cone Relocate or modify existing utilities as needed. Impacts to existing underground power and fiber are anticipated. Install new pavement markings for the proposed taxiway extension. The work generally consists constructing a new asphalt (P-401 asphalt) taxiway, demolition of existing asphalt pavement, construction of new asphalt pavement, drainage, grading, and pavement marking, as well as new LED airfield lighting and signage installation. https://procurement.opengov.com/portal/flysfb/projects/245313 procurement@osaa.net
PREBID
4/2/2026 7:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT