Access the Full Project by Clicking here!
Bidjugde
JOB
Francis Street Storm Drain
BID DATE
12/16/15 - 11:00
AGENCY
Ontario
ESTIMATE
n/a
SCOPE
The work to be performed under this contract consists of construction of a channel connection to West Cucamonga Creek Channel, containment walls along the Channel, abandonment of existing 66-inch RCP channel connection, installation of reinforced concrete pipe of sizes varying from 18-inch to 120-inch including trench repair, construction of catch basins, local depressions, manholes, junction structures, reinforced concrete box (6’x4’), 6-inch and 8-inch CML&C water pipe and appurtenances, relocation and/or replacement of fire hydrants and water services, 14-inch GE PVC waterline, appurtenances and junction structure connection, installation of curb and gutter, sidewalk, street lights, cross gutter, access ramps, drive approaches, header and slot grinding, base paving, placement of asphalt leveling course, placement of ARHM overlay, PCC pavement, removal & replacement of existing landscape and irrigation in like and kind, traffic striping, markings and signage, traffic signal modification at Francis Street and Grove Avenue, installation of landscaping and irrigation, and any other appurtenances necessary to complete the improvements as described in the Plans and Specifications. Purchasing, 909-395-2012 purchasing@ci.ontario.ca.us
PREBID
12/2/2015 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT