Access the Full Project by Clicking here!
Bidjugde
JOB
Storm Drain Improvements East Avenida Cordoba Via Avila
BID DATE
05/20/26 - 7:00
AGENCY
San Clemente
ESTIMATE
n/a
SCOPE
The work to be performed, in general, consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and contract documents for the construction of the Storm Drain Improvements at East Avenida Cordoba and Via Avila, City of San Clemente. The general method of the storm drain construction work includes demolition and replacement of existing concrete catch basins, local depressions, cross gutter, A.C. pavement and Portland cement concrete curb & gutters, sidewalks, curb ramp, traffic detector loops, trenching and installation of new Reinforced Concrete pipes (RCP) within existing roadways and Right-of-Ways, erosion control BMP’s, and construction of new concrete junction structures, manholes and collar. The work also includes traffic control. https://vendors.planetbids.com/portal/28939/bo/bo-detail/140004 ohanaj@san-clemente.org
PREBID
4/29/2026 3:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT