Access the Full Project by Clicking here!
Bidjugde
JOB
Narcissus Rd Roadway Drainage Improvements
BID DATE
04/9/26 - 3:00
AGENCY
Galveston County
ESTIMATE
n/a
SCOPE
The milling and resurfacing of an asphalt paved road. The rehabilitation of the roadway begins with using a milling machine to remove the top 4.5 inches of the distressed asphalt wearing course and a portion of the underlying aggregate base. This milled material is hauled and disposed of off-site, while the newly exposed base is proofrolled to identify localized base failure areas. Any identified failures are saw-cut, excavated, and patched using Type B Hot Mix Asphalt Concrete (Black Base). Following a thorough cleaning of the surface to ensure proper adhesion, a prime coat is spray-applied to the base course before placing and compacting a 2-inch asphaltic concrete level-up course. Install reinforcing grid and tack coat on leveling course. Tack coat is applied to facilitate bonding for a 2.5-inch surface course, which is compacted to the specified in-place density. Striping and signage shall be installed per the engineering plans before the road is opened to traffic. https://www.civcastusa.com/project/69bab4032d3cfb0bf3d97a0a/summary stanford.nguyen@collierseng.com
PREBID
3/31/2026 3:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT