Access the Full Project by Clicking here!
Bidjugde
JOB
Shared Use Path Lavender Pit East Segment
BID DATE
04/20/26 - 8:00
AGENCY
Bisbee
ESTIMATE
n/a
SCOPE
Sealed bids will be received by the City of Bisbee for reconfiguring the existing four-lane roadway into a three-lane roadway and adding a shared-use path (SUP) along SR 80, including demolition, paving, concrete, grading, drainage, signage, pavement marking, lighting, and traffic control improvements. The scope area is a 10–16-foot-wide asphalt concrete path along SR 80. https://www.bisbeeaz.gov/bids.aspx?bidID=67
PREBID
4/1/2026 3:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT