Access the Full Project by Clicking here!
Bidjugde
JOB
MacArthur Boulevard Pavement Rehabilitation Median Improvements
BID DATE
04/21/26 - 3:00
AGENCY
Newport Beach
ESTIMATE
$7,500,000
SCOPE
The work necessary for the completion of this contract consists of mobilization and demobilization, best management practices (BMPs); staking and survey monument restoration; traffic control plan preparation and implementation; clearing and grubbing; root pruning; utility company coordination and utility verification; removal of existing roadway improvements, removal of existing “pork chop” islands, subgrade preparation, cold milling of existing asphalt and removal of existing fabric; construction of asphalt concrete (AC) pavement, asphalt rubberized hot mix (ARHM) pavement, full depth pavement section repairs, new raised PCC medians, new landscaping and irrigation, installation of wiring from existing SCE meter to new irrigation control panels, new irrigation control pedestals with new irrigation controllers, installing new irrigation controller in existing cabinet, installing new trees and shrubs, relocating fire hydrant and modifying water line to new location, constructing PCC sidewalk, PCC driveway and integral curbs; PCC cross gutter, spandrels, and integral curbs, PCC curb and gutter, PCC curb, PCC curb ramps, construction monument foundation and new breakaway monument sign, remove existing and install new manhole ring frame and covers, utility adjustments, traffic street light box and lid replacements, traffic signal rehabilitation and modification at two intersections, installation of CCTV equipment, installation of LED intersection luminaires, installation of LED internally illuminated street name signs with custom sign panels, and other items shown on, but not limited to plan no. T-7049-S, installation of new traffic signal, poles, traffic signal heads, intersection lights, conduits, signal wiring and pull boxes, replacement of traffic signal loop detectors, installation of advanced loop extension, traffic signage improvements, thermoplastic striping, new thermoplastic bike lane striping and legends and painted curb improvements, and repairs to impacted or damaged landscaping and irrigation system improvements; as-built plan preparation, and all other work required by the Contract Documents. https://vendors.planetbids.com/portal/22078/bo/bo-detail/139379 bdavis@newportbeachca.gov
PREBID
4/8/2026 3:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT