Access the Full Project by Clicking here!
Bidjugde
JOB
Eastern Regional Materials Recovery Facility Pavement Repairs Phase 2
BID DATE
04/14/26 - 4:00
AGENCY
Placer County
ESTIMATE
n/a
SCOPE
All Work improvements including, but not limited to; demolition of existing asphalt pavement, grinding asphalt, repair select pre-cast utility structures/boxes/risers manholes, install concrete collars at repaired structures, off-haul demolition materials to on-site location; prepare aggregate base grade, install new pre-cast lids, storm drain manhole extensions and reinforced concrete collars; protect all existing utilities; place new asphalt concrete pavement at grind areas and repair area; crack repairs; place Type II Slurry Seal; replace pavement markings new stormwater improvements and prepare SWPPP/WPCP/Erosion Control Plan. Provide temporary best management practices (BMPs) devices for erosion control and traffic control as required by the plans, specifications and special conditions. https://placer.bidsandtenders.net/Module/Tenders/en/Tender/Detail/6e8e59f1-2030-4184-8477-ff5a66e978bf TPratt@placer.ca.gov
PREBID
4/1/2026 3:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT