Access the Full Project by Clicking here!
Bidjugde
JOB
2026 02 Court Plaza Construction
BID DATE
04/7/26 - 7:00
AGENCY
Baker City
ESTIMATE
n/a
SCOPE
The Project involves the construction of 2,450 square feet (SF) of 4-inch concrete sidewalk (historic sidewalk jointing), 1,800 SF of 6-inch concrete sidewalk, 1,900 SF of 6-inch exposed aggregate sidewalk, and 2,075 SF of paver driving surface. The Work also includes 1,000 SF of concrete sitting wall with stacked rock facing and capstone. New Site improvements include ornamental light poles and utility trenching for electrical and irrigation conduit, together with all other Work to complete the Project as shown on the Drawings and specified herein. https://www.bakercity.com/2175/Current-Solicitations pwadirector@bakercity.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT