Access the Full Project by Clicking here!
Bidjugde
JOB
A Street Wastewater Capacity Improvements
BID DATE
04/9/26 - 7:00
AGENCY
Port Angeles
ESTIMATE
$4,000,000
SCOPE
Installation of new 12 to 18-inch nominal diameter PVC gravity sewer main within an existing and active sewer alignment via open cut construction within existing City of Port Angeles right-of-way. Sewer service to be maintained by the Contractor throughout construction via bypass pumping. Installation of new 8-inch DIP potable water main to replace existing 8-inch AC water main. Installation of new 10-inch DIP potable water main to replace existing 10-inch CI water main. Replacement of 4 water gate valves. Removal, disposal, replacement, and reconnection of 16 sanitary sewer manholes. Removal, disposal, replacement, and reconnection of 9 stormwater catch basins. Installation of 2 new curb ramps. Installation of new 6-inch PVC storm drain laterals to replace existing storm drain laterals where impacted by gravity sewer main construction. Demolition of existing sanitary sewer piping along the new gravity sewer alignment. Demolition and replacement of various existing roadway and site features along the gravity sewer alignment. Trench, roadway, and roadside restoration of the site. http://bxwa.com/bxwa_toc/pub/296/pa63_a_street_wastewater_capac_62321/info.php Lbaack@cityofpa.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT