David Court Waterline Storm Drainage Paving Upgrades
BID DATE
04/9/26 - 6:00
AGENCY
Fife
ESTIMATE
n/a
SCOPE
The work for the Waterline Upgrade includes installation of new 8-inch and 12-inch waterlines totaling 1,633 linear feet in 26th Street East and Berry Lane East. There will be three points of connection. Two connections will be made in David Court East and one connection will be made within the public easement located immediately west of the terminus of 26th Street East. Three new fire hydrants will be installed, and seventeen residential water services will need to be reconnected. The existing 6-inch asbestos water main will be abandoned in place except where it conflicts with new improvements. http://bxwa.com/bxwa_toc/pub/3014/fif47_david_court_waterline_st_13061/info.php nlathrop@cityoffife.org jbedolla@fifewa.gov