2026 Pavement Maintenance Overlay
BID DATE
03/31/26 - 7:00
AGENCY
Everett
ESTIMATE
$3,175,853
SCOPE
The project includes, is not limited to, *The construction of up to 10,842 tons of Hot Mix Asphalt, Class ½-inch, PG 64-22, two inches (2”) thick, on selected City Streets, including grinding, utility adjustments, such as manhole, catch basin, inlet, valve box, monument case and cover, striping, channelization, traffic induction loops*, and performing all other work as required by the contract. http://bxwa.com/bxwa_toc/pub/263/ev69_2026_pavement_maintenance_64377/info.php