Access the Full Project by Clicking here!
Bidjugde
JOB
Pat Hallisey Park PK2001
BID DATE
04/20/26 - 7:00
AGENCY
League City
ESTIMATE
n/a
SCOPE
This project consists of the construction and development of a new public park facility, including but not limited to the construction of concrete drives and parking areas, concrete paving, sports fields, park lighting, landscaping, irrigation systems, architectural features, underground utilities, playground facilities, detention ponds, drainage improvements, and associated earthwork. Work shall include site clearing, grading, excavation, installation of drainage and utility infrastructure, construction of park amenities and facilities, and all appurtenant work necessary to provide a complete and operational park facility in accordance with the Contract Documents. The Contractor shall be responsible for implementing erosion and sediment control measures and maintaining compliance with the Texas Pollutant Discharge Elimination System (TPDES) Construction General Permit. The Contractor shall prepare, implement, and maintain a Stormwater Pollution Prevention Plan (SWPPP) in accordance with applicable Texas Commission on Environmental Quality (TCEQ) requirements, including submission of all required Notices of Intent (NOI), site postings, inspections, and documentation throughout the duration of construction. https://www.leaguecitytx.gov//Bids.aspx?BidID=857 purchasing@leaguecitytx.gov
PREBID
3/31/2026 7:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT