Access the Full Project by Clicking here!
Bidjugde
JOB
Raitt Street Protected Buffered Bike Lane Rehabilitation
BID DATE
04/9/26 - 7:00
AGENCY
Santa Ana
ESTIMATE
$13,373,000
SCOPE
Includes excavation, grading, removal and replacement of asphalt concrete pavement, cold milling, removal and replacement of concrete pavement, protection of surface utilities for slurry seal, crack sealing, slurry sealing, Portland cement concrete grinding, concrete bus pad, concrete alley apron, concrete driveways, concrete medians, concrete curb and gutter, concrete sidewalk, concrete curb ramps, concrete cross-gutters, adjusting utilities to finished grade, landscape and irrigation, root shaving, installation of bike lanes (Class II, III, and IV), removal and installation of traffic loops, installation of new electrical pull boxes, street light, traffic signal modifications, traffic signal installation, hybrid beacon installation, signing and striping. https://vendors.planetbids.com/portal/20137/bo/bo-detail/139894 CIPContracts@santa-ana.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT