Access the Full Project by Clicking here!
Bidjugde
JOB
Roosevelt Basha Tank Rehabilitation
BID DATE
12/15/15 - 3:35 REAL-TIME
AGENCY
Chandler
ESTIMATE
$2,158,666
SCOPE
3:30 not 3:00. Added as Real Time. DUE 12/14, OPEN 12/15. Work under this contract includes: tank rehabilitation at the Roosevelt Water Production and Basha Water Production Facilities, which includes: removal of baffle curtains and weights from a tank; sand blasting the entire interior and recoating of tanks; power washing and over coating of tanks; demolition and rework of existing suction piping to the pump station and fill piping to a tank; install of new ladder and hatch; install a new PAX mixer and chlorine injection piping; install sample pump; install a new chlorine analyzer with mechanical and electrical items; replace shotcrete and asphalt, and paint new piping and equipment.
PREBID
11/17/2015 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT