Access the Full Project by Clicking here!
Bidjugde
JOB
Phase IV Roadway Improvements
BID DATE
11/23/15 - 3:00 LIVE!
AGENCY
Mesa
ESTIMATE
$1,500,000
SCOPE
This contract shall be for furnishing all labor, materials, transportation , and services for the construction and/or installation of all improvements shown on the Plans, including, but not limited to the following: 1. Eastmark Parkway – Phase 2 (S852) - The Project consists of approximately 1900 feet of half street surface improvements to include concrete curb and gutter, sidewalk, paving, striping, signage, street lights, street sleeves, landscaping and landscape irrigation. The improvements also consist of the installation of a 16” water line for a portion of the roadway. 2. Eastmark Phase 1A – Eastmark Parkway Phase (S853) - The Project consists of installing sewer and waterline improvements in the 1900 feet of Eastmark Parkway Phase 2 as indicated. The South Encore Phase of these plans is not included in this project. 3. Eastmark Parkway & Signal Butte Entry (S854) - The Project consists of the construction of a concrete box culvert under Eastmark Parkway at the Signal Butte Road intersection. The improvements also include landscaping and landscape irrigation at this location. 4. Signal Butte Road (S855) - The Project consists of approximately 1900 feet of half street surface improvements to include concrete curb and gutter, paving, storm drain, striping and signage. 5. Signal Butte/Williams Field Channel (S856) - The Project consists of providing erosion protection measures to approximately 8800 feet of a previously graded drainage channel along Signal Butte Road and Williams Field Road.
PREBID
11/12/2015 3:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT