Access the Full Project by Clicking here!
Bidjugde
JOB
26 12 Guadalupe Street Phase 1 Sewer Water Expansion
BID DATE
04/1/26 - 8:00
AGENCY
Guadalupe County
ESTIMATE
n/a
SCOPE
The turnkey construction services required for the installation and/or modification of both existing and proposed public water and sewer lines. The SOW also consists of the ancillary project requirements (i.e., permitting, installation of Storm Water Pollution Prevention Plan, demolition and build back/repair of existing Hot Mixed Asphalt Pavement roadway, identification and clearance of existing utilities, excavation and backfill of utility trenches, the installation of public water and sewer and pipe in strict accordance with both manufacturer’s protocols and procedures and engineering specifications, and site restoration for any areas disturbed as a part of the project construction activities) that are a part of the work required to provide a project executed and completed in place.. https://www.bidnetdirect.com/texas/solicitations/open-bids/RFP-26-12-Guadalupe-Street-Phase-1-Sewer-Water-Expansion/0000414124?purchasingGroupId=8407551&origin=2
UPDATES