Access the Full Project by Clicking here!
Bidjugde
JOB
Midway Pump Station Telemetry System Improvements Drainage Improvements Multiple Sites
BID DATE
04/15/26 - 7:00
AGENCY
Miami-Dade County
ESTIMATE
n/a
SCOPE
Work includes but is not limited to the construction and installation of drainage structures, French drains, miscellaneous drainage improvements, driveway restoration, grading, sodding, and miscellaneous roadway restoration including construction of concrete curb and gutters, and sidewalks where needed in accordance with the construction plans and specifications. Additionally, the work includes the upgrading the existing Telemetry System at the Midway Pump Station and at the Canal as follows: 1. NW 82 Avenue and NW 5 Lane a. This task includes work on the Pollution Control Structure (Water control Structure) located at NW 82 Ave and NW 5 Ln. Work includes the removal and installation of a solar panel and RTU system and integration into the County’s SCADA Network. All work and materials shall be furnished by Emerson Process Management. 2. Midway Pump Station b. This task includes work on one (1) stormwater pump station located at NW 7 Street and just West of SR 826 Expwy. Work includes the installation of the Rosemount Non-Contact Radar Level Sensor, Ultrasonic Sensor for Wet Well-Level, Backup Local Pump Controller and CW-MICRO communication to be installed on existing RTU. The contractor shall install these items to the exiting RTU and integrated into the County’s SCADA Network. https://www.miamidade.gov/apps/isd/StratProc/Home/SolicitationDetails?solNumber=20260067%20(MCC%207360%20Plan) clerk.board@miamidadeclerk.gov
PREBID
4/2/2026 4:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT