Access the Full Project by Clicking here!
Bidjugde
JOB
Bruceville Eddy 2023 Cdbg Water Line Improvements
BID DATE
03/31/26 - 7:00
AGENCY
Bruceville-Eddy
ESTIMATE
$450,000
SCOPE
Replacement of existing water line with 1800 lf of 6" PVC C900 including installation and connection to existing infrastructure. Includes valves, fittings, roadway repair and testing. https://www.civcastusa.com/project/69a79c5989044accdd51135c/summary smurrah@5m-associates.com
PREBID
3/23/2026 7:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT