Access the Full Project by Clicking here!
Bidjugde
JOB
Blackhawk Boulevard Reconstruction Phase Ii Repackage C
BID DATE
03/31/26 - 7:00
AGENCY
Friendswood
ESTIMATE
$7,500,000
SCOPE
The replacement of a four-lane curb-and-gutter concrete roadway along Blackhawk Boulevard from FM 2351 to approximately 500 feet south of Pennystone Way and Thursa Lane to FM 528. This includes pavement, drainage (24” – 42” RCP and 5’x3’ RCB), and 12” PVC water line at locations that is not PVC. This project also includes installation of 24â€� transmission water main from FM 2351 to Edenvale Street. https://www.civcastusa.com/project/69a8f240c6b4f518d21cbd09/summary engineering@friendswood.com
PREBID
3/19/2026 3:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT