Access the Full Project by Clicking here!
Bidjugde
JOB
Blackhawk Boulevard Reconstruction Phase Ii Repackage C
BID DATE
03/31/26 - 7:00
AGENCY
Friendswood
ESTIMATE
$7,500,000
SCOPE
The replacement of a four-lane curb-and-gutter concrete roadway along Blackhawk Boulevard from FM 2351 to approximately 500 feet south of Pennystone Way and Thursa Lane to FM 528. This includes pavement, drainage (24” – 42” RCP and 5’x3’ RCB), and 12” PVC water line at locations that is not PVC. This project also includes installation of 24 transmission water main from FM 2351 to Edenvale Street. https://www.civcastusa.com/project/69a8f240c6b4f518d21cbd09/summary engineering@friendswood.com
PREBID
3/19/2026 3:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT