Access the Full Project by Clicking here!
Bidjugde
JOB
Richmond Street Rehabilitation Phase I
BID DATE
03/31/26 - 7:00
AGENCY
Richmond
ESTIMATE
n/a
SCOPE
Roadway and drainage improvements for Mulberry Drive, Cedar Drive, Chestnut Lane, and Teakwood Street in Richmond, Texas. The work includes the rehabilitation of the existing concrete pavement along the four (4) streets, totaling approximately 4,000 linear feet of proposed 7-inch concrete pavement with 8-inch lime stabilized subgrade, along with 6-inch concrete curb. Improvements also include reconstruction of the existing sidewalks with approximately 3,900 square yards of proposed 5-foot sidewalk and installation of ADA pedestrian ramps, where required. Additionally, approximately 2,800 square yards of existing residential driveways and aprons will be reconstructed. Drainage enhancements will consist of upsizing the existing storm sewer system with approximately 2,300 linear feet of circular reinforced concrete pipe ranging from 18-inches to 42-inches, approximately 400 linear feet of 18-inch by 29-inch arched reinforced concrete pipe, and approximately 250 linear feet of 23-inch by 36-inch arched reinforced concrete pipe. Water line offsets will be installed in locations where the proposed storm sewer system conflicts with the existing water line. The project also includes traffic control, miscellaneous signage, stormwater pollution prevention measures, site restoration, and other items necessary to complete the project. https://www.civcastusa.com/project/69aaf6e6d9f00478348e46e4/summary sray@cobbfendley.com
PREBID
3/17/2026 7:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT