Access the Full Project by Clicking here!
Bidjugde
JOB
2025 08 Castle Estates Neighborhood Sewer Main
BID DATE
03/24/26 - 4:00
AGENCY
Leon Valley
ESTIMATE
n/a
SCOPE
The project includes the installation of 1,576 linear feet of 8” sewer main with trench repair and the installation of 7 manholes with 54 vertical feet of extra depth. This work also includes the installation of 251 linear feet of sewer laterals with two-way cleanouts. Additional work necessary to complete the construction include, but are not limited to, barricades, signs, and traffic handling and post construction sewer main television inspections. https://www.civcastusa.com/project/69a1d19ab7050c79a50d76ea/summary dwalker@ardurra.com
PREBID
3/10/2026 3:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT