Access the Full Project by Clicking here!
Bidjugde
JOB
Cast Iron Water Main Replacement Phase 1 Evergreen Ridge
BID DATE
03/23/26 - 3:00
AGENCY
Snohomish County
ESTIMATE
$2,600,000
SCOPE
The work to be performed for this project consists of removing and disposing of cast iron and ductile iron pipe water mains; installing 6-inch and 8-inch diameter ductile iron pipe water main; removing valves and installing gate valves; removing and replacing service lines; removing and replacing hydrants; permitting; construction survey and staking; project temporary traffic control; construction sequencing; temporary water pollution and erosion prevention; utility potholing; removing and replacing road pavement; pavement planning and asphalt overlay: concrete sidewalk, curb ramp and driveway replacements; adjustment of utility cover(s); channelization; restoring the site including property restoration; and other related work. http://bxwa.com/bxwa_toc/pub/2854/e1448_cast_iron_water_main_rep_41760/info.php hradosevich@slwsd.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT