Access the Full Project by Clicking here!
Bidjugde
JOB
Hollywood Tunnel North Portal Pressure Control Structure Valve Replacement
BID DATE
04/23/26 - 7:00
AGENCY
Metropolitan WD
ESTIMATE
$7,300,000
SCOPE
The work consists of removing two existing 24-inch sleeve valves and two existing 24-inch plug valves; installing two Metropolitan furnished (MFE) 24-inch knife gate valves and two MFE 24-inch sleeve valves; removing an existing 16-inch lubricated plug valve; installing one MFE 16-inch lubricated plug valve; replacing air release and vacuum valves; constructing various electrical, instrumentation, and control systems improvements; replacing ladders and platform; reinforced concrete improvements; and other appurtenant work as specified and shown on the drawings. https://vendors.planetbids.com/portal/16151/bo/bo-detail/139244 specsdesk@mwdh2o.com
PREBID
3/25/2026 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT