Storm Drainage System Rehabilitation Replacement Alester Avenue Various Locations
BID DATE
04/2/26 - 8:00
AGENCY
Palo Alto
ESTIMATE
n/a
SCOPE
The Storm Drainage System Replacement and Rehabilitation Project (SD-25000) has 2 project locations. The first is on Alester Avenue from Hamilton Avenue to Dana Avenue and the second is on Lambert Avenue and Birch Street. Based on the history of flooding in the area, this project proposes to upsize of the existing 12-inch line to 36-inch pipe for additional storage capacity. Pipe replacement in the streets may require additional work such as striping, sidewalk, curb and gutter, and curb ramp due to the location of the existing storm drain pipes. Due to the upsizing of the pipes, the connected catch basins will have to be removed and replaced. https://procurement.opengov.com/portal/palo-alto-ca/projects/244946 steven.dimter@paloalto.gov