Access the Full Project by Clicking here!
Bidjugde
JOB
SAWS Emergency Interconnect
BID DATE
03/18/26 - 7:00
AGENCY
Fair Oaks Ranch
ESTIMATE
$387,000
SCOPE
Consists of approximately 700 linear feet of water main improvements starting along Leslie Pfeiffer Drive, including the replacement and upsizing of existing 3-inch and 6-inch water lines to a 12-inch transmission main. This phase will extend toward and connect with the City’s existing 12-inch main located along Fair Oaks Parkway. Consists of construction of the emergency interconnect to the existing SAWS water main located within established utility easements along Leslie Pfeiffer Drive. This phase includes installation of the master meter assembly, reduced pressure backflow prevention device, isolation valves, and associated appurtenances necessary to provide a controlled, metered, and protected one-way flow of water from SAWS to FORU. https://www.civcastusa.com/project/69a899d467f5138eb2abf04a/summary choelscher@fairoaksranchtx.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT