Access the Full Project by Clicking here!
Bidjugde
JOB
Lawrenceville Gateway Trail Trailhead
BID DATE
03/26/26 - 3:00
AGENCY
Lawrenceville
ESTIMATE
n/a
SCOPE
This work shall consist of furnishing all labor, materials and equipment necessary for the installation of temporary and or permanent traffic striping as per the drawing. During the application of the thermoplastic material, the pavement shall be clean and completely dry, the temperature of the pavement shall be between 60º F - 140º F. The temperature of the thermoplastic material shall be as recommended by the manufacturer. The minimum thickness shall be 0.12 inches. https://www.lawrencevillega.org/bids.aspx?bidID=386 purchasing@lawrencevillega.org
PREBID
3/16/2026 7:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT