Access the Full Project by Clicking here!
Bidjugde
JOB
Hilltop Needmore Park Greenway Resurfacing
BID DATE
03/17/26 - 7:00
AGENCY
Fuquay Varina
ESTIMATE
n/a
SCOPE
The project scope includes, but is not limited to, resurfacing the existing greenway system within the Park as identified in the project exhibit. Work includes selective milling to address root heave and localized surface irregularities; placement of a 2-inch asphalt leveling course in milled areas as directed; and installation of a 1.25-inch asphalt overlay over the greenway system. https://www.fuquay-varina.org/bids.aspx?bidID=164 csimonson@fuquay-varina.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT