Access the Full Project by Clicking here!
Bidjugde
JOB
North Main Grind Overlay
BID DATE
03/19/26 - 11:00
AGENCY
Pendleton
ESTIMATE
n/a
SCOPE
This Project shall include the construction of approximately 264 LF of City standard curb and gutter, 770 SF of sidewalk, asphalt grinding, 1,270 tons of asphalt plus pre-leveling as needed. The HMAC for this Project shall be 1/2-inch Dense Level 3 with PG 64-28 grade oil to top lift, and Level 2 with PG 64-28 for pre-level asphalt. HMAC shall be placed in one 2-inch lift. https://oregonbuys.gov/bso/external/bidDetail.sda?docId=S-KN0040-00016116&external=true&parentUrl=close wayne.green@pendletonor.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT