Access the Full Project by Clicking here!
Bidjugde
JOB
Highlands Reservoir Water Main Improvements
BID DATE
03/25/26 - 11:00
AGENCY
Renton
ESTIMATE
$9,000,000
SCOPE
Installation of approximately 5,400 linear feet of 6-inch to 16-inch restrained-joint ductile iron water main and appurtenance, including 69 gate and butterfly valves, 8 fire hydrants, 35 water service lines, 34 connections to existing water mains, and the in-place abandonment, removals and disposals of existing water system and asbestos cement pipes. - Installation of approximately 1,600 linear feet of 8-inch to 18-inch storm pipes, along with 18 storm catch basins and manholes. - Restoration of surface conditions including asphalt trench patching, asphalt overlay, and reconstruction of concrete curbs, gutters, and sidewalks. - Implementation of traffic control, erosion and sedimentation control measures, and trench safety systems. http://bxwa.com/bxwa_toc/pub/299/ren86_highlands_reservoir_wate_24314/info.php ksrilofung@rentonwa.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT