Access the Full Project by Clicking here!
Bidjugde
JOB
Roadway Improvements CR 1143 US 64 CR 1125 CR 1145 CR 1143 Pleasant Hollow Rd
BID DATE
03/5/26 - 12:00
AGENCY
Smith County
ESTIMATE
$1,650,000
SCOPE
Preparation of Right-of-way shall consist of cleaning the edges of the roadway and removal of vegetation. 2. Rework the existing pavement structure within the limits as designated and/or as directed by the County Engineer. Initial rework of the existing asphalt pavement and base material shall be to a total depth of ten inches (10”) utilizing Item 251, Type D. 3. Cement treatment of the scarified area shall be to the depth, width and application rate shown in the table below. The cement treated area shall be compacted by ordinary compaction methods. https://www.publicpurchase.com/gems/smithco,tx/bid/bidView?bidId=209461 chaney@smith-county.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT