Access the Full Project by Clicking here!
Bidjugde
JOB
Roadway Improvements CR 129 CR 113 US HWY 69
BID DATE
03/5/26 - 12:00
AGENCY
Smith County
ESTIMATE
$910,000
SCOPE
Preparation of Right-of-way shall consist of cleaning the edges of the roadway and removal of vegetation.2. Rework the existing pavement structure within the limits as designated and/or as directed by the County Engineer. Initial rework of the existing asphalt pavement and base material shall be to a total depth of eight inches (8”) utilizing Item 251, Type D.3. Cement treatment of the scarified area shall be to a depth of eight inches (8”). Cement is to be applied at an estimated rate of 19.0 LBS/SY. The cement treated area shall be compacted by ordinary compaction methods. https://www.publicpurchase.com/gems/smithco,tx/bid/bidView?bidId=209459 chaney@smith-county.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT