Access the Full Project by Clicking here!
Bidjugde
JOB
Roadway Improvements CR 452 US 69 FM 2710
BID DATE
03/5/26 - 12:00
AGENCY
Smith County
ESTIMATE
$1,870,000
SCOPE
Preparation of Right-of-way shall consist of cleaning the edges of the roadway and removal of vegetation. Rework the existing pavement structure within the limits as designated and/or as directed by the County Engineer. Initial rework of the existing asphalt pavement and base material shall be to a total depth of ten inches (10”) utilizing Item 251, Type D. Cement treatment of the scarified area shall be to a depth of ten inches (10”). Cement is to be applied at an estimated rate of 24 LBS/SY. The cement treated area shall be compacted by ordinary compaction methods. After treated area has cured, the surface may be primed as directed by the County Engineer or his designee. HMAC overlay of the widened roadway shall include sweeping the pavement surface and the application of a tack coat immediately prior to the placement of a Type “D” HMAC surface course with a final minimum thickness of two inches (2”). https://www.publicpurchase.com/gems/smithco,tx/bid/bidView?bidId=209460 purchasing@smith-county.com chaney@smith-county.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT