Lufkin Isd Lufkin Middle School Bus Drive
BID DATE
03/16/26 - 11:00
AGENCY
Lufkin ISD
ESTIMATE
$230,000
SCOPE
Construction of approximately 2,725 square yards (SY) of reinforced concrete paving, subgrade grading, re-shaping and compaction, 64 linear feet (LF) of 18” HDPE Culverts, bedding, 4” to 8” Rock riprap, filter fabric, two (2) concrete pavement tie-ins, topsoil shoulder up paving edges, finish grading and hydromulch seeding / fertilizing disturbed areas with traffic control and safety measures. https://www.civcastusa.com/project/69971972bcbae1ac9e47dde2/summary poates@glstexas.com