Access the Full Project by Clicking here!
Bidjugde
JOB
SR85 Gila Bend Buckeye (NH-085 B (206) T)
BID DATE
11/20/15 - 11:00 LIVE!
AGENCY
ADOT
ESTIMATE
$4,550,000
SCOPE
The proposed project is located in Maricopa County in the Yuma District on State Route 85 from Gila Bend to Buckeye between Gila Bend Airport mile post 121.52 and mile post 130.42. The purpose of the project is to rehabilitate the existing asphaltic concrete pavement in order to maintain the structural integrity, ride quality, and safety of the roadway, allowing the continued movement of people, goods, and services through this corridor. The proposed project scope consists of removing and replacing the existing pavement surfaces on all lanes, taper areas, and shoulders, installing new guardrails within the existing paved road prism, as needed, extending existing reinforced concrete box culvert headwalls vertically from the existing roadway to tie into new guardrails, as needed, and shoulder buildup between MP 121.52 and MP 122.69. In the NB lanes between MP 122.69 and MP 130.42, the proposed project scope consists of removing and replacing the existing pavement surfaces on the travel, passing, and Gila Mountain Road left turn lane, installing new guardrails within the existing paved road prism, as needed, extending existing reinforced concrete box culvert headwalls vertically from the existing roadway to tie into new guardrails, as needed, shoulder buildup, sealing cracks on existing shoulders, and applying fog coat and blotter. New roadway striping would be applied to the new roadway surface. And other related work

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT