Access the Full Project by Clicking here!
Bidjugde
JOB
Lower Beach Lake Berm Seepage Mitigation
BID DATE
04/1/26 - 11:00
AGENCY
Sacramento
ESTIMATE
n/a
SCOPE
Site Preparation • Clearing and grubbing of approximately 0.8 acres of vegetation and debris. • Removal of existing trees, root balls, and concrete structures. Demolition and Excavation • Removing the existing concrete cap, riprap, and 36-inch CMP culvert segment. • Excavation and salvage of existing ripraps and soil for reuse. Temporary Works • Construction of a temporary cofferdam. Seepage Cutoff System • Installation of approximately 6,790 square feet of hot-rolled steel sheet piles. Backfill and Reconstruction • Placement of Controlled Low-Strength Material (CLSM) backfill around sheet piles. • Installation of geotextile separators and aggregate base as needed for stabilization. • Rebuilding the berm using imported fill and Caltrans Class I rock slope protection. • Construction of a new reinforced concrete cap over the sheet pile wall. Environmental Protection and Stormwater Compliance • Preparation and implementation of a SWPPP and erosion control plan. • Environmental monitoring during construction (biologist and environmental compliance oversight). https://vendors.planetbids.com/portal/15300/bo/bo-detail/136436 ggulseth@cityofsacramento.org
UPDATES