Access the Full Project by Clicking here!
Bidjugde
JOB
Live Oak Full Depth Roadway Reconstruction
BID DATE
03/18/26 - 7:00
AGENCY
Hutto
ESTIMATE
n/a
SCOPE
For Full-depth roadway reconstruction at multiple locations within the City of Hutto. The project consists of the removal of 7 inches of existing asphalt, base, and subgrade and replacement with 5 inches of Type D asphalt and 2 inches of Type B asphalt, including all required traffic control, cleanup, and compliance with City of Hutto specifications. https://www.huttotx.gov/bids.aspx?bidID=62 procurement@huttotx.gov.
PREBID
2/25/2026 8:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT