Access the Full Project by Clicking here!
Bidjugde
JOB
FY 2025 26 Sewer Lining
BID DATE
03/26/26 - 7:00
AGENCY
Huntington Beach
ESTIMATE
n/a
SCOPE
The project consists primarily of lining existing sewer pipes based on maintenance history and video inspection. This project will use exclusively UV lining technologies. Total linear footage for UV lining is estimated at approximately 29,850 LF combined among 8”, 10”, 12”, and 15” pipe diameters. The locations of work are shown in the accompanying maps included herein. These locations would benefit from lining as the existing pipes are either scaled with calcium deposits from groundwater seepage through pipe and minor cracks and joints, or have joints intruded with tree roots from adjacent mature trees located on parkways. Additional items include grinding and re-opening approximately 668 service laterals and rehabilitating approximately 66 manholes, including removal of any and all steps inside each manhole. https://vendors.planetbids.com/portal/15340/bo/bo-detail/138307 mlewis@ardurra.com
UPDATES