Access the Full Project by Clicking here!
Bidjugde
JOB
Seattle Street Singapore Lane Improvements
BID DATE
03/5/26 - 12:00
AGENCY
Jersey Village
ESTIMATE
n/a
SCOPE
Concrete pavement, curb, and sidewalk removal; storm sewer, storm sewer manholes and inlet removal; water line abandonment; tree protection and removal; mailbox removal and replacement; storm sewer, storm sewer junction box and inlet construction; storm sewer tie-ins to adjacent systems; water line construction and service transfers; roadway excavation and subgrade stabilization; reinforced concrete pavement and curb construction; sidewalk, wheel chair ramp, and driveway construction; pavement markings; site restoration; and implementation of the traffic control and storm water pollution prevention plans. Two additive alternates have been added for polypropylene pipe in lieu of reinforced concrete pipe, and cement stabilized subgrade in lieu of lime stabilized subgrade. https://www.civcastusa.com/project/698cd527b79cfa7edb7cba04/summary tanner.mckay@westwoodps.com
PREBID
2/25/2026 12:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT