GJ26 90 ZMLSD Wastewater Reclamation System Construction
BID DATE
03/5/26 - 3:00
AGENCY
Zion Mountain Local SD
ESTIMATE
n/a
SCOPE
Primary tanks located at each point of wastewater generation throughout the Project Area will provide solids settling and preliminary digestion prior to discharging primary effluent into a watertight, liquid-only pressure collection network. Effluent from all primary tanks will be conveyed to an equalization tank to buffer diurnal flows to the WREC facility and will be screened after passing through the equalization tank. https://utah.bonfirehub.com/opportunities/220513