Access the Full Project by Clicking here!
Bidjugde
JOB
N2M25 154 Sewer Lift Station No 5 Replacement
BID DATE
03/12/26 - 7:30
AGENCY
Alhambra
ESTIMATE
n/a
SCOPE
The Project consists of installing a new precast polymer wet well, valve vault and bypass vault, along with all mechanical equipment and appurtenances, electrical equipment, upgrades to service, control, and instrumentation systems, installing approximately 103 feet of 8-inch VCP gravity sewer pipe with 3 new precast polymer manholes, repurposing the existing dry well to be used as emergency storage, and abandonment of the existing wet well. https://www.alhambraca.gov/bids.aspx?bidID=219 tamare@alhambraca.gov
PREBID
2/17/2026 8:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT