Access the Full Project by Clicking here!
Bidjugde
JOB
Broadway Ogden Lane Improvements
BID DATE
03/13/26 - 11:00
AGENCY
Alamo Heights
ESTIMATE
$1,500,000
SCOPE
The design builds upon four (4) main goals for the project: -Realign the intersection of Broadway and Ogden Lane -Create public gathering space in the form of a plaza or patio on the west side of Broadway -Construct dedicated pedestrian crossing of Broadway featuring pedestrian hybrid beacon and install safe pedestrian infrastructure to cross Ogden Lane -Incorporate landscape design to maintain shade within the public space, provide beautification, and to facilitate stormwater management The Broadway and Ogden Lane improvements project includes the following components: -Realign the intersection of Ogden Lane at Broadway to consolidate into a single point for two-way traffic, intersecting with Broadway at a 90-degree angle. -Install widened sidewalk zones along Broadway and Ogden Ln. -The area abandoned by the realigned intersection will be converted into public patio and plaza spaces. Install a stormwater management bioswale in the south plaza that is located and sized to mimic existing flow conditions. -Within the patio and plaza spaces, install landscaped planting zones, bounded by hardscape such as buffer walls. -In the south plaza, incorporate and spotlight the existing memorial sign honoring President John F. Kennedy’s visit to the San Antonio area the day before his assassination. -Install pedestrian-focused mid-block crossing across Broadway, to include mast arms and a pedestrian refuge island in the middle of Broadway. -Relocate targeted utility poles in coordination with CPS energy. -Install pavement, enhanced signage and pavement markings, and lighting to maximize visibility and safety. https://www.civcastusa.com/project/6980d1be2d7e21ff08f29d04/summary planey@alamoheightstx.gov
PREBID
2/19/2026 8:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT