Access the Full Project by Clicking here!
Bidjugde
JOB
Cast Iron Main Replacement Phase 2 Silver Lake Water Sewer District
BID DATE
03/3/26 - 8:00
AGENCY
Snohomish County
ESTIMATE
$4,332,000
SCOPE
The work to be performed for this project consists of water improvements. Water main improvements include but are not limited to construction of approximately 1,340 linear feet of new 12-inch diameter DI water main, approximately 4,060 linear feet of new 8-inch diameter DI water main, approximately 60 linear feet of new 6-inch diameter DI water main, isolation valving, 116 water service connections, 11 fire hydrants, 5 combination air release/vacuum valve assemblies, 19 connections to existing water main, removal, haul, and disposal of approximately 660 linear feet of existing 4-, 6-, 8-, and 10-inch diameter water main, and abandonment of existing 4-, 6-, and 8-inch diameter water main. Additional work includes temporary and permanent trench patching, a 2-inch grind and overlay, channelization, restoration, temporary erosion control, and traffic control. http://bxwa.com/bxwa_toc/pub/2854/e1380_cast_iron_main_replaceme_29019/info.php hradosevich@slwsd.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT