Access the Full Project by Clicking here!
Bidjugde
JOB
North Donnelly Street Emergency Roadway Repair Permanent
BID DATE
03/16/26 - 7:00
AGENCY
Mount Dora
ESTIMATE
n/a
SCOPE
This is a roadway reconstruction project along Donnelly Street from approximately 120 feet north of Limit Avenue to approximately 180 feet south of the existing pedestrian bridge. The project also includes the installation of a 24” culvert and U-endwalls with baffles. The total length of the project is approximately 1,100 linear feet. This project includes the reconstruction of Donnelly Street including milling and resurfacing, guardrail installation and striping. Other construction elements include mobilization, erosion control, clearing and grubbing, regular excavation, embankment, stabilization and sod. Bid Alternate No. 1 – “North Donnelly Street Slope Stabilization, Erosion Control and Sidewalk Improvements.”: This work consists of the construction of roadway embankment improvements on a portion of North Donnelly Street north of Limit Avenue to improve stormwater drainage improvements and pedestrian safety. Project items include removal of existing pedestrian boardwalk and drainage inlets and piping, and widening the roadway to include a 4’ wide asphalt bike lane, approximately 1,100 linear feet of concrete curb and gutter, 10’ wide concrete pedestrian trail with railing, three pedestrian shelters with benches, stormwater inlets, piping with outlet structures, and additional embankment with landscaping. https://ci.mount-dora.fl.us/bids.aspx?bidID=239 handj@mountdora.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT