Access the Full Project by Clicking here!
Bidjugde
JOB
Civic Center Wastewater Treatment Facility - Pipelines and Pump
BID DATE
12/8/15 - 2:30
AGENCY
Malibu
ESTIMATE
n/a
SCOPE
The proposed improvements consist of connection to injection wells, and treatment plant pipelines, installation of well pumps and associated electrical/control equipment, recycled water distribution system and a wastewater collection system. The work includes lift stations, electrical, instrumentation/controls, HDPE pipelines, HDPE manholes, concrete manholes, air release valves, recycled water service laterals, trenching, trenchless pipe installation, Best Management Practices (BMP), mitigation, monitoring and reporting requirements, traffic control, dewatering, asphalt pavement, retaining wall, and all other appurtenant work included and as shown on the Plans and in the Contract Documents and Specifications. Rob DuBoux at 310-456-2489, ext. 339 or rduboux@malibucity.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT