Access the Full Project by Clicking here!
Bidjugde
JOB
Water System Performance Improvements 1
BID DATE
03/19/26 - 12:00
AGENCY
Truth Consequences
ESTIMATE
n/a
SCOPE
"The project includes the replacement and new installation of waterlines using open trench, and horizontal directional drilling (HDD) methods. Open trench construction consists of approximately 388 LF of 6-inch C-900-DR-18 PVC pipe, 4,905 LF of 8-inch C-900-DR-18 PVC pipe, 6,721 LF of 12-inch C-900-DR-18 PVC pipe, and 2,997 LF of 14-inch C-900-DR-18 PVC pipe, and an approximately 220 LF of 12-inch C-900 DR-18 FPVC waterlines installed by horizontal directional drilling. The replacement of the new water service lines, service lines, meters, hydrants, connections to the existing system and site work to include roadway asphalt removal and replacement. The project also includes Installation of Five (5) new concrete vault with new PRV’s which changes the water system configuration from a two-pressure zone system to a four-pressure zone to control pressure within a 35 to 95 psi design envelope range. All the waterline replacements will be 3 to 5 feet parallel to the existing waterlines and new waterline installation with 6’ wide by 4’ deep trench. (Base Bid includes Sheets CU-228 to CU-243 / CU-244 to CU-267 / CU-270 to CU-273 / CU-628). ADDITIVE ALTERNATE 1: The project includes replacement and new installation of approximately. ,140 LF of 8-inch C-900-DR-18 PVC pipe, 257 LF of 12-inch C-900-DR-18 PVC pipe. The project also included the replacement of the new water service lines, service lines, meters, hydrants, connections to the existing system and site work to include roadway asphalt removal and replacement. The project also includes Installation of two (2) new concrete vault with new PRV’s , and one (1) new PRV without concrete vault which changes the water system configuration from a two-pressure zone system to a four-pressure zone to control pressure within a 35 to 95 psi design envelope range. All the waterline replacements will be 3 to 5 feet parallel to the existing waterlines and new waterline installation with 6’ wide by 4’ deep trench. (Additive Alternate 1 Includes Sheets CU-268, and CU-273). ADDITIVE ALTERNATE 2: The project includes replacement and new installation of approximately. 202 LF of 6-inch C-900-DR-18 PVC pipe. The project also the replacement of the new water service lines, service lines, meters, hydrants, connections to the existing system and site work to include roadway asphalt removal and replacement. All the waterline replacements will be 3 to 5 feet parallel to the existing waterlines and new waterline installation with 6’ wide by 4’ deep trench. (Additive Alternate 2 Includes Sheets CU-269). https://www.bidnetdirect.com/new-mexico/solicitations/open-bids/WATER-SYSTEM-PERFORMANCE-IMPROVEMENTS-1-WSPI-1/0000410451?purchasingGroupId=8406351&origin=1 jholguin@torcnm.gov "

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT