Access the Full Project by Clicking here!
Bidjugde
JOB
100343 Century Blvd Extension SE Lois Street E Main Street
BID DATE
03/11/26 - 10:00
AGENCY
Washington County
ESTIMATE
$50,000,000
SCOPE
"Construct roadway widening including curbs, curbs and gutters, curb ramps, bike lanes, driveways, and sidewalks. 2. Construct new water lines, water meters, utilities and structure. 3. Construct storm conveyance system and storm water treatment facility. 4. Construct retaining walls. 5. Install Rectangular Rapid Flashing Beacon (RRFBs), and illumination. 6. Install conduits and junction boxes for future signal interconnect. 7. Install new signing and striping. 8. Install/Extend sanitary sewer laterals.9. Reconstruct/Overlay pavement. 10. Construct a bridge over Rock Creek. 11. Construct Flood Overflow Channel. https://procurement.opengov.com/portal/washington-county-or/projects/230739 kira_furby@co.washington.or.us "

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT