Access the Full Project by Clicking here!
Bidjugde
JOB
Farmers Market Phase 2 Pedestrian Access Ramp
BID DATE
02/12/26 - 12:00
AGENCY
Santa Cruz - CA
ESTIMATE
n/a
SCOPE
The Project to be performed consists of furnishing all labor, materials, tools, equipment, and transportation required to complete the Project, with a scope of work to generally include, but is not limited to, the following: remove a section of existing concrete wall, remove existing asphalt concrete pavement, remove existing base /soil to grade the working area to have the proposed finished grades and slopes shown on the plans with a final pavement section of 6-inch class 2 aggregate base and 3-inch HMA, install landscaped planter fill with 6”-8” cobble stones, install Caltrans 3-1/2 pull boxes and 2-inch conduit and reconnect street lights conductors for complete operation. https://procurement.opengov.com/portal/santacruzca/projects/231505 dcabreros@santacruzca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT